The performance of each part is checked and processes needed for the science operation for real observation is prepared through commissioning until January 17, 2025. During the commissioning, power up, pointing system checkout, coronagraph checkout, camera bakeout, dark image acquisition, on-orbit alignment (alignment between the sun sensor and the instrument to reduce stray light), exposure time check, compression characteristics check, observation sequence verification, and so on are progressed.
- 〉